Although the day
started out with a dense fog, all the students were
bused to the building site to mark the occasion. Click on the thumbnails
below to view photos:
The first load of
rebar arrives on the construction site. This rebar will
be used in the footings.
Mr. Jenks leads
singing on site!
Happy students on the
building site.
Ron Knutson and Brian
Fritts, SJA’s construction consultant, inspects the
lines that mark where the excavator is to dig trenches
for the footings.
Mr. Harris is briefed
about the project by Ron Knutson
SJA students and
faculty line up to give a hearty ‘Thank You’ cheer. This
is an exciting day!
Not long after the
pictures of the children were taken the sun broke
through the fog and the digging progressed in beautiful
weather!